• Home
  • Portfolio
    • 360 Rosemary
    • Faena
    • Hard Rock Expansion
    • Hard Rock Remodel
    • Hilton Hotel – WPB
    • Jade Signature
    • Omni PGA Hotel
    • Paradise Plaza
    • Porsche Design Tower
    • Rosemary Square
    • The Bristol
  • About Us
  • Our Services
  • Contact Us
  • Home
  • Portfolio
    • 360 Rosemary
    • Faena
    • Hard Rock Expansion
    • Hard Rock Remodel
    • Hilton Hotel – WPB
    • Jade Signature
    • Omni PGA Hotel
    • Paradise Plaza
    • Porsche Design Tower
    • Rosemary Square
    • The Bristol
  • About Us
  • Our Services
  • Contact Us

Hard Rock Remodel

Expansion and remodel of the largest casino in Florida, with over a mile of slot machines and games.

Meticulous installation technique and creative design for an unrivaled gaming and entertainment destination.The project included the interior facilities.

02  

Development

Developing a plan to remove existing flooring and reinstalling the new walkway required extensive coordination with the facility and construction team.

Designing the walkway to go over suspended floors, expansion joints, and dissimilar substrates with the capacity to support heavy traffic of people required lots of testing and unconventional methods.

01  

Conceptual Design

Robust and energetic materials that match the Hard Rock style create a walkway throughout the casino resembling “The Yellow Brick Road,” which took the design team 2 years to develop.

03  

Execution

Installing a winding floor within an active casino behind hidden temporary partitions and drapes required precise survey equipment and the ability to custom fabricate and adapt pieces to unforeseen site conditions. The 108,400 sq. ft. of this project took over 2 years to complete.

01  

Conceptual Design

Robust and energetic materials that match the Hard Rock style create a walkway throughout the casino resembling “The Yellow Brick Road,” which took the design team 2 years to develop.

02  

Development

Developing a plan to remove existing flooring and reinstalling the new walkway required extensive coordination with the facility and construction team.

Designing the walkway to go over suspended floors, expansion joints, and dissimilar substrates with the capacity to support heavy traffic of people required lots of testing and unconventional methods.

03  

Execution

Installing a winding floor within an active casino behind hidden temporary partitions and drapes required precise survey equipment and the ability to custom fabricate and adapt pieces to unforeseen site conditions. The 108,400 sq. ft. of this project took over 2 years to complete.


(954) 920-8028
821 North 21st Avenue
Hollywood FL, 33020

Portfolio
About Us
Services
Contact Us

Giving Back
Safety First
Careers
Privacy Policy
Accessibility

© Copyright Twin Stone - 2020