• Home
  • Portfolio
    • 360 Rosemary
    • Faena
    • Hard Rock Expansion
    • Hard Rock Remodel
    • Hilton Hotel – WPB
    • Jade Signature
    • Omni PGA Hotel
    • Paradise Plaza
    • Porsche Design Tower
    • Rosemary Square
    • The Bristol
  • About Us
  • Our Services
  • Contact Us
  • Home
  • Portfolio
    • 360 Rosemary
    • Faena
    • Hard Rock Expansion
    • Hard Rock Remodel
    • Hilton Hotel – WPB
    • Jade Signature
    • Omni PGA Hotel
    • Paradise Plaza
    • Porsche Design Tower
    • Rosemary Square
    • The Bristol
  • About Us
  • Our Services
  • Contact Us

Porsche Design Tower

Timeless and sophisticated stone work for the infamous Porsche Luxury High Rise  Condominiums.

Crafted from the most luxurious materials offering texture and dimension.The project included the Main Lobby Floor, Restroom, Fireplace, Spa, and all unit’s kitchen tops, lavatories, and laundry tops. 

02  

Development

The stonework fulfilled both aesthetic design and engineering demands. The material had to follow the shape of the building, requiring coordination between the quarries and production, while stone suspending from ceilings, flooring that could withstand vehicular traffic, and large stone fixtures demanded a state-of-the-art mechanical system. 

01  

Conceptual Design

An architectural and engineering project exhibiting functional design, innovation, and future-forward style. The building includes floor and wall designs with radii and curves, resembling Porsche cars’ sleek aerodynamics.

03  

Execution

With over 200,000 sq. ft. of stone, a fast-paced schedule requiring the latest industrial techniques, all production was executed at the Twin Stone facility and installed within 12 months.

01  

Conceptual Design

An architectural and engineering project exhibiting functional design, innovation, and future-forward style. The building includes floor and wall designs with radii and curves, resembling Porsche cars’ sleek aerodynamics.

02  

Development

The stonework fulfilled both aesthetic design and engineering demands. The material had to follow the shape of the building requiring coordination between the quarries and production while stone suspending from ceilings, flooring that could withstand vehicular traffic, and large stone fixtures demanded a state of the art mechanical system.

03  

Execution

With over 200,000+ sq. ft. of stone, a fast-paced schedule requiring the latest industrial techniques, all production was executed at the Twin Stone facility and installed within 12 months.


(954) 920-8028
821 North 21st Avenue
Hollywood FL, 33020

Portfolio
About Us
Services
Contact Us

Giving Back
Safety First
Careers
Privacy Policy
Accessibility

© Copyright Twin Stone - 2020